Fairplay Wastewater Treatment Plant

Fairplay, Colorado

Owner:

Fairplay Sanitation District


Engineer:

Burns & McDonnell Engineering Co., Inc.

Contract Amount:

Award Contract: $5,051,030


Contract Type:

Negotiated Design-Build


Project Summary:

The project involved construction of a new wastewater treatment plant and demolition of the existing antiquated lagoon system. The headworks and clarifier components of the treatment plant were constructed in a single facility to speed construction and minimize costs. The clarifiers and process piping were placed 20 feet below grade to meet high altitude, severe climate design requirements. The plant is located above 9,800’ elevation.